Back to overview
Maintenance
Server provider change & central infrastructure changes
Dec 06 at 12:00am CET
–
Dec 07 at 12:00am CET
Affected services
EcoZend API Status
Resolved
Dec 06 at 12:00am CET
I will most likely be making major changes to EcoZend's infrastructure over those two days. These changes include a server provider switch as well as major changes to how EcoZend is operated, started, maintained and so on. These changes allow EcoZend to operate more cost-effectively while also delivering more performance. However, a long downtime is highly likely, but we are trying to make plans to prevent this as much as possible.
Affected services